© engineersinside.com |
All those pictures were taken on January 28th, and at the moment those are the newest pictures online. The photos are showing the implementation of the load test (O-Cell® Test Pile -78.0 m depth) for Kingdom Tower’s foundation. As we heard recently, those test piles failed and they had to redesign some stuff around the tower's base. That's why tower moved on the drawing board again so that can be fixed.
Now we are waiting top hear what happened and what is going to happen.
Stay tuned!
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
© engineersinside.com |
No comments:
Post a Comment